日韩毛片在线视频x,夜夜夜夜曰天天天天拍国产,亚洲人成人伊人成综合网无码,四虎国产精品永久地址入口

Cross


Order Hotline
18968916333
15397399668

Industry news 網(wǎng)站首頁Industry news

Things to be aware of when the cross-cutting machine is finished

發(fā)布日期:[2018-12-30]     點(diǎn)擊率:

The cross-cutting machine can be used for the cutting of paper materials such as coated paper, coated paper, kraft paper and paper-plastic composite, plastic sheet, etc., especially suitable for the production of paper industry and paper processing industry. Then, when using the cross-cutting machine, it is necessary to carry out regular maintenance, so as to ensure the smooth running of the machine and the cutting quality of the product.

First of all, the cross-cutting machine should be installed in a place that is dry, ventilated, with good light and convenient operation. Secondly, after each operation, it is necessary to clean the dust and paper scraps on the machine in time, check the cutter and the grinding wheel, check whether there is any abnormality in the running part, and reasonably add the lubricating oil. Side by side net oil moisture high and water storage tank. Finally, it is necessary to cut off the power of the cross-cutting machine according to the operation requirements of the manual and maintain the computer operating system.

crosscutting machine

The basic daily maintenance of the cross-cutting machine, the general principle is that the inspection, cleaning, and lubrication maintenance work is fully in place to ensure that the various components of the equipment are in good condition. In addition, it is also important to improve the technical quality and level of the operators. It is necessary to be responsible for the operation of the control part. No one is allowed to operate without permission.

Do a good job of maintenance and maintenance. First of all, daily maintenance should be in place. The principle is to lubricate, clean, clean (no dust, no debris) in place to ensure that the sliding part of the equipment is in good condition. Followed by maintenance work, regular and irregular inspections of the rotating parts (especially for real-time monitoring of consumables). Regular adjustments are made, regularly replaced, and detailed records are made to extend the life of the equipment. Regular cleaning and inspection of the electrical parts should be carried out in a timely manner to eliminate hidden dangers.

Use high quality slitters and cross cutters. Improve the technical quality and level of the operator, and be responsible for the operation of the control part. No one can operate it without permission.

Tr

主站蜘蛛池模板: 5858s亚洲色大成网站www| 亚洲精品无码久久久久去q| 无码午夜人妻一区二区不卡视频| 大尺度无遮挡激烈床震网站| 国产人妻人伦精品无码麻豆| 亚洲图片小说激情综合| 国精品人妻无码一区二区三区d3| 伊人婷婷六月狠狠狠去| 亚洲成av人片天堂网| 亚洲www永久成人网站| 国产成人精品日本亚洲18| 亚洲经典千人经典日产| 国产精品视频2020年最新视频| 国产av永久精品无码| 男男?高潮片免费视频| 国产亚洲日韩欧美一区二区三区| 久久成人麻豆午夜电影| 99久久精品费精品国产| 亚洲精品无码中文久久字幕| 鲁大师影院在线观看| 少女韩国电视剧在线观看完整| 夜夜躁狠狠躁日日躁孕妇| 伊人久久大线影院首页| 中文字幕久久精品无码| 无码人妻精品一区二区三区夜夜嗨 | 欧美性受xxxx黑人xyx性爽| 久热re这里精品视频在线6| 装睡被陌生人摸出水好爽| 人禽交 欧美 网站| 久久精品国产久精国产一老狼| 日本肉体xxxx裸体137大胆| 麻豆中字一区二区md| 亚洲综合色成在线观看| 亚洲精品久久久久久久蜜桃| 国产成人亚洲综合图区| 国产精品久久自在自线| 暖暖 免费 高清 日本 在线| 免费观看全黄做爰大片国产| 亚洲中文字幕无码av网址| 欧美成人亚洲高清在线观看| 精品国产成人一区二区|